教育资源为主的文档平台

当前位置: 查字典文档网> 所有文档分类> 范文> 其他范文> 英文采购合同

英文采购合同

上传者:网友
|
翻新时间:2011-12-28

英文采购合同

  contract no.:xxx

  sales and purchase contractfor

  manganese ore

  this contract is made and entered into onxx, febXXunder terms and conditions as per the international chamber of commerce-600 (icc ucp-600/XX revision) by and between:

  the buyer:

  address:

  tel:

  the seller :

  address:

  tel:

  whereby seller agrees to sell to buyer and buyer agrees to buy from seller manganese ore under following the terms and conditions stipulated below:

  article 1 commodity

  concentrated  manganese ore

  article 2 specifications

  concentrated  manganese ore

  size: 0-5mm (90% min)

  % mn min.       40.0%

  % fe max.      15.0%

  % silica ( sio2 ) max.      1.0%

  % aluminum ( al ) max.      4.0%

  % s max.      0.20%

  % p max.      0.10%

  moisture max.      7%

  article 3 quantity:

  500 mt, partial shipment not allowed.

  article 4 origin and port of loading

  4.1 republic of abc

  4.2 loading port:

  article 5 packing/delivery

  5.1 in50 kg sack

  5.2 incontainer shipment, more or less 20 tons.

  article 6  shipment/delivery

  6.1 500mt(+/-5%)partial shipment not allowed

  6.2 shipment will be 90 days after signing of this contract and after the acceptance of the letter of credit by seller’s bank. l/c will be openedafter buyerreceivingproforma invoice from sellerwith confirmation of the delivery schedule.

  6.3 the buyer has the right to appoint the independent surveyor or his representative to conduct the pre-shipment inspection and/or conduct the joint-inspection of the material with buyer for his own account.

  article 7 contracted price and values

  price:mn: 48% and above - usd0.00/%/dmtcfrcy port, china

  40% - 47.9%  - usd 0.00 /%/dmtcfrcy port, china

  the mn content will be average of the joint-inspection testing result at loading port.

  article 8 payment

  8.1 payment shall be effected in full by an irrevocable letter of credit, which will be opened by 1stclass bank in hong kong or singapore, 100% at sight upon presentation of shipping documents.

  a. seller’s banking details:

  bank name        :

  bank address     :

  account name     :

  s.w.i.f.t. code swift    :

  b. buyer’s bank issues l/c to the seller's bank via s.w.i.f.t. wire transfer.

  buyer’s banking details:

  bank name                 : (will be advised)

  bank address    :

  account name:

  s.w.i.f.t. address swift   :

  article 10 inspection of analysis & weight

  the shipmentinspection and analysis shall be done byccicappointed by the seller and one independent surveyor (i.e.: sgs or geo-chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. while final weightand qualitydetermination shall be done atloadingportby the above joint-survey.moisture content shall be deducted from the total weight shipped.

  article 11 documents

  seller shall present the following documents to the buyer:

  a.    signed commercial invoice for 100% of the total cargo value indicating, quantity, unit price and the total amount of value of the delivered commodity , 1 original and 3 copies.

  b.    certificates of quantity, quality and weight issued byccicand one independent surveyor appointed by the buyer.

  c.   certificate of origin issued by abc department of trade or concerned government authorities, i original and 2 copies.

  d.   weight list, showing total weight , 1 original and 3 copies.

  e.    bill of lading, 3 original copies and 3 non-negotiable copies.

  article 12 force majeure

  the seller shall not be responsible for the delay of shipment or non-delivery of the goods due to force majeureunder ucp 600. the seller shall advise the buyer immediately of the occurrence mentioned above and within 3 days thereafter the seller shall send a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under whose jurisdiction the accident occurs as evidence thereof. under such circumstances the seller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. in case the accident lasts for more than 60 days the buyer shall have the right to cancel the contract.

  article 13 arbitration

  all disputes arising out of or in connection with this contract shall be finally resolved by arbitration in accordance with the rules of arbitration of the international chamber of commerce (ucp-600/XX or uniform customs and practice for documentary credits) by one or more arbitrators appointed in accordance with the said rules. the arbitration shall be conducted in abcbythe english language.

  buyer                                                                 seller

  (authorized signature/seal)                             (authorized signature/seal)annex 1-------international chamber of commercepublished copy of theuniform customs and practice for documentary credits-600/XX. a copy of the publication is attached to the contract for sales and purchase of philippine manganese ore signed by and between_____________and _________________ dated ________________.

下载文档

版权声明:此文档由查字典文档网用户提供,如用于商业用途请与作者联系,查字典文档网保持最终解释权!

网友最新关注

乡村夜景图 改写《西江月》
我的座右铭
20年后的房子
小书迷
家乡的变化
1和9的故事
一次有意义的活动
游儿童公园记
我成为了一名小记者
卖艺少年
瞧,这父子俩
小蚂蚁与毛毛虫的战争
我想对你说
柳树之赞
丰收之歌
申请加工资申请书
大学生转专业申请书
公司电工转正申请
个人工作调动申请书
外出实习申请书
2011年优秀班级申请书
实习申请书格式
解除查封扣押申请书
增加诉讼请求申请书
脱产学习申请书
员工转正申请书范本
中专优秀团员申请书
毕业生工作转正申请书
多媒体教室借用申请书
司法会计审计申请书
大型电弧炉除尘系统方案的研究
电站锅炉受热面管子安装焊接缺陷的产生及防止
地质勘查与找矿中的困难与对策
房建项目成本管理与成本控制
简析采煤机的故障及其维修对策
化工工艺设计中存在的问题研究
分析岩土工程中基坑支护工程存在的问题
洗煤生产中的常见问题及改进策略探讨
浅谈高强混凝土的应用
简析热轧铝板带材生产线工艺及设备特性
如何克服手弧焊的磁偏吹
关于煤矿中机电一体化应用的探析
浅谈大比例尺地形图在工程测量中的应用
镍基合金表面再结晶对高温低周疲劳性能影响的研究
预制T梁混凝土表面气泡成因分析与防治
《卜算子·咏梅》教学设计之二
《向往奥运》教学设计之四
《灯光》教学设计之二
《卜算子·咏梅》第二课时教学设计之一
《卜算子·咏梅》教学设计之一
《为人民服务》教学设计之六
《卜算子·咏梅》教学设计之三
《卜算子·咏梅》教学设计之四
《向往奥运》教学设计之一
以读悟情以情激情——《向往奥运》教学设计
《向往奥运》教学设计之三
《为人民服务》教学设计之五
《延安,我把你追寻》教学设计之一
《向往奥运》教学设计之二
《卜算子·咏梅》第一课时教学设计之一