文献翻译封面
南 昌 工 程 学 院
级毕业(设计)论文文献翻译
题 目
学 生 姓 名 赵 宜
班 级 电气工程及其自动化1班
学 号 2011100491
指 导 教 师 许惠君
日 期 2015 年 1 月 7 日
南 昌 工 程 学 院 教 务 处 订 制
评语:
指导教师:
年 月 日
Small current grounding system
Small current grounding system -- the small current grounding system: neutral point ungrounded or through the arc suppression coil and high impedance grounded three-phase system, also known as the neutral point indirectly grounded system. When one phase ground fault occurs, because it can not form a short circuit loop, the grounding fault current is often much smaller than theload current, so the system is known as "the small current grounding system".
1The division standard
In the division of standards in China: X0/X1>4 - 5 system belongs to the small current neutral grounding system (system American and Western EuropeX0/X1>3 belongs to the small current neutral grounding system)
Of which: X0 as the system zero sequence reactance, X1 as the system positive sequence reactance.
2 small current neutral voltage unbalance of system analysis
In actual operation, often to monitor bus voltage unbalance phenomenon caused by many reasons, the bus voltage imbalance, the methods of handling failures due to vary. (1) a phase two fuse in the busbar voltage mutual inductor. The phenomenon ofcentral signal alarm, voltage transformer, a phase voltage is zero, the other two phase voltage is normal. Such as three-phase voltage 10kV for 0kV, 6.1kV,6.1kV. Treatment strategies such as low voltage protection: exit associated with the transformer, the replacement of two fuse. (2) a phase of a fuse in the busbar voltage mutual inductor. The voltage from thetable reflects a phase voltage is greatly reduced, the other two phase voltage isdecreased in different degree. I board the Qinghai Lake bus. I board the Qinghai Lake bus voltage is 6.7kV, 5.2kV, 2.5kV, voltage transformer C exit inspection found a fuse, after replacement, put into operation, the voltage normal. (3) outgoing to
0kV, the
circuit grounding grid, which non
fault
phase voltage
is common
in normal
operation
condition. Grounding, fault phase voltage is reduced, the grounding metalcompletely reduced
increases, metal fullygrounding for line for
to produce
small zero deal
current
sequence current this device,through with through
the the arc
voltage rise. Some Substation & "selection grounding detection device &", according grounding, can judge the operations
of
the grounding line. If
the substation without
staff elected grounding line, to
maintenance an
in two
phase
timely dispatch notification line grounding often cause grounding, resulting Firstly, according
to
personnel. Because
explosion, bus short
circuit, especially
arrester voltage the ground can
pull no
transformer oiltemperature heating, easy to damage the equipment, causing line another point causeintermittent network voltage should not be increased.
the operation
experience and choice principle, first
power, maximum branches, the longest line, load the lightest and no importantuser line, after the pull less branches, the shortest line, heavy load and important user line.
The skilled operation mode. If a substation, the normal mode two main transformers in parallel operation, grounding, usually disconnected sectional breaker to narrow the search for ground range. Once, a main
maloperation of sectional transformer,grounding, the operating section of personnel of busbar voltage breakermisoperation, caused a
loss. Before the operationshould fully consider the power balance, protection coordination, arc suppression coil voltage adjustment, whether qualified problem.
After the transformer outlet circuit breaker in one by one to pull close, ground notselected. Probably because the bus and bus of substation owned equipment grounding or two back to the outlet with a grounding.
The choice has the power line, the first small hydropower solution column, so as to avoid the "crash" accident.
The one loop tripping, appear at the same time the bus bar grounding. Try to send the loop is usually not successful. The reason is: if a circuit is connected with the occurrence of A, B, C two relative to the increase of the voltage, often caused by another circuit insulation weak occurs at the B phase or C phasebreakdown, the formation of two-phase earth short circuit. Because of current transformer connection method for incomplete star, have a 2/3 chance of only the removal of a line. At this time, to compare the two circuit transmission lineload size and properties, send a return line. If the line instantaneous grounding,try to send success, does not exist the problem of selecting circuit.
The selected ground line, should inform the distribution personnel to handle as soon as possible, substation attendant to want to strengthen the equipmentinspection work.
(4) wire loop phase deficient operation, the electric effects of bus voltagesignificantly in grid. 35kV substation load is small, long branch distribution line, aloop of a phase drop fuse, if the branch load is bigger, the fault phase voltageincrease of load rejection, the non fault phase voltage is reduced. If the branchload is small, the line is capacitive, or for small power Internet line, fault phaselose capacitor or power, thus the voltage is reduced, the non fault phase voltageof fault phase voltage is high, the influence of bus voltage balance in a certain extent. Select the loop after notification distribution personnel processing.
(5) most of the 35kV rural substation in and out line and transformer high-voltage side using a drop fuse instead of circuit breaker, happen to fall off a single phase fusing or line break, the Rural Power Grid Substation busbar voltage unbalance.The transformer phase deficient operation of the abnormal noise, current faultphase 0. The operating personnel should
(6) line be timely replacement three-phase of fuse element,if affect the thebus line broken, the substation all blackout, notify the relevant personnel patrol line, processing. asymmetry parameter, the load imbalance may
voltage balance. My bureau of substation
maintenance, will 35kV three-phase voltage are be co - Tang - 199km respectively 21kV, 18kV, 21kV, spring long Xing - Song
- match line exit after the operation, the three-phase voltage is 21kV, the main line is not perfect, the transposition of the line parameters caused by the unbalanced.
小接地电流系统
小电流接地系统--小电流接地系统:中性点不接地或经过消弧线圈和高阻抗接地的三相系统,又称中性点间接接地系统。当某一相发生接地故障时,由于不能构成短路回路,接地故障电流往往比负荷电流小得多,所以这种系统被称为"小电流接地系统"。
1划分标准
在我国划分标准:X0/X1>4~5的系统属于小接地电流系统 (美国和西欧X0/X1>3的系统属于小接地电流系统)其中:X0为系统零序电抗,X1为系统正序电抗。 2小电流接地系统电压不平衡的原因分析
在实际运行中,常会监视到母线电压不平衡的现象,引起母线电压不平衡的原因很多,处理的办法因故障而异。 (1)母线电压互感器一相二次熔丝熔断。现象为中央信号警铃响,电压互感器一相电压为零,另外两相电压正常。如10kV母线三相电压为0kV,6.1kV,6.1kV。处理对策:退出低压等与该互感器有关的保护,更换二次熔丝。
(2)母线电压互感器一相一次熔丝熔断。从电压表反应出一相电压大幅度降低,其他两相电压有不同程度的降低。我局青海湖变母线电压为6.7kV,5.2kV,2.5kV,退出电压互感器检查发现C相一次熔丝熔断,更换之后,投入运行,电压恢复正常。
(3)出线回路发生接地,这是电网常见的不正常运行状态。发生接地时,故障相对地电压降低,金属性的完全接地时降为0kV,非故障相对地电压升高,金属性的完全接地时升为线电压。有的变电所有&"小电流接地选检装置&",根据接地时产生零序电流,能判断出接地的线路。若变电所内无此装置,则通过运行人员的操作选出接地线路之后,通过及时调度通知线路维护人员去处理。因为接地时常引起母线避雷器爆炸、电压互感器发热喷油、高温的电弧容易损坏设备,引起线路另一点接地,造成两相短路,尤其是间歇性的接地还能引起网络电压不应有的升高。
①要根据运行经验及选检原则,先拉无电源、分支最多、线路最长、负荷最轻和无重要用户的线路,后拉分支较少、线路最短、负荷较重和重要用户的线路。 ②熟练掌握运行方式。如某一变电所,正常方式下两台主变并列运行,接地时,通常断开分段断路器来缩小查找接地的范围。有一次,一台主变,发生接地,运行人
下载文档
热门试卷
- 2016年四川省内江市中考化学试卷
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
- 山东省滨州市三校2017届第一学期阶段测试初三英语试题
- 四川省成都七中2017届高三一诊模拟考试文科综合试卷
- 2017届普通高等学校招生全国统一考试模拟试题(附答案)
- 重庆市永川中学高2017级上期12月月考语文试题
- 江西宜春三中2017届高三第一学期第二次月考文科综合试题
- 内蒙古赤峰二中2017届高三上学期第三次月考英语试题
- 2017年六年级(上)数学期末考试卷
- 2017人教版小学英语三年级上期末笔试题
- 江苏省常州西藏民族中学2016-2017学年九年级思想品德第一学期第二次阶段测试试卷
- 重庆市九龙坡区七校2016-2017学年上期八年级素质测查(二)语文学科试题卷
- 江苏省无锡市钱桥中学2016年12月八年级语文阶段性测试卷
- 江苏省无锡市钱桥中学2016-2017学年七年级英语12月阶段检测试卷
- 山东省邹城市第八中学2016-2017学年八年级12月物理第4章试题(无答案)
- 【人教版】河北省2015-2016学年度九年级上期末语文试题卷(附答案)
- 四川省简阳市阳安中学2016年12月高二月考英语试卷
- 四川省成都龙泉中学高三上学期2016年12月月考试题文科综合能力测试
- 安徽省滁州中学2016—2017学年度第一学期12月月考高三英语试卷
- 山东省武城县第二中学2016.12高一年级上学期第二次月考历史试题(必修一第四、五单元)
- 福建省四地六校联考2016-2017学年上学期第三次月考高三化学试卷
- 甘肃省武威第二十三中学2016—2017学年度八年级第一学期12月月考生物试卷
网友关注
- 湘教版六年级下册科学期末考试试卷
- 乐清育英学校初中新生招生语文毕业模拟试卷
- 小学生汉字听写比赛活动方案
- 小主持人社团活动计划
- 新疆内初班考生测试数学
- 第23届2008年宁波市信息学竞赛初赛试题 含答案
- 问题学籍名册
- 推荐对象
- 公立学校2014年小学毕业生考试语文试卷
- 小升初大联盟语文模拟卷
- 《2015年松山湖义务教育阶段学校招生工作方案》
- 小升初 数学 习题及答案 浓度问题(17)
- 教师申报滑县课题所填表册
- 小学品德与社会复习资料
- 广州小升初学校代号及相关暗语
- 成语 词语总结
- 春蕾白云教学五认真检查总结
- 名思小学奥数训练题库整除性
- 国旗国歌试题
- 2014年东莞市东华中学小升初英语入学试卷
- 讽刺社会
- 龙山一小“班班通”应用教学达标竞赛活动
- 关于公布2015年河市中心小学“六项技能”素质竞赛结果的通知[1]
- 李开坤-论文
- 多伦多
- 荣誉证书的打印模板
- 公立学校2014年小学毕业生数学摸底试题
- 2015年东莞东华中学招生简章
- 三数口算题
- 浅析如何培养和激发学生的学习动机
网友关注视频
- 化学九年级下册全册同步 人教版 第18集 常见的酸和碱(二)
- 冀教版小学数学二年级下册第二单元《余数和除数的关系》
- 七年级下册外研版英语M8U2reading
- 精品·同步课程 历史 八年级 上册 第15集 近代科学技术与思想文化
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,辽宁省
- 第4章 幂函数、指数函数和对数函数(下)_六 指数方程和对数方程_4.7 简单的指数方程_第一课时(沪教版高一下册)_T1566237
- 北师大版数学四年级下册3.4包装
- 冀教版小学英语四年级下册Lesson2授课视频
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 4
- 北师大版数学四年级下册第三单元第四节街心广场
- 8.对剪花样_第一课时(二等奖)(冀美版二年级上册)_T515402
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 7
- 第五单元 民族艺术的瑰宝_16. 形形色色的民族乐器_第一课时(岭南版六年级上册)_T3751175
- 外研版英语三起5年级下册(14版)Module3 Unit1
- 河南省名校课堂七年级下册英语第一课(2020年2月10日)
- 3月2日小学二年级数学下册(数一数)
- 飞翔英语—冀教版(三起)英语三年级下册Lesson 2 Cats and Dogs
- 【部编】人教版语文七年级下册《老山界》优质课教学视频+PPT课件+教案,安徽省
- 3.2 数学二年级下册第二单元 表内除法(一)整理和复习 李菲菲
- 冀教版小学数学二年级下册第二单元《有余数除法的竖式计算》
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,湖北省
- 8.练习八_第一课时(特等奖)(苏教版三年级上册)_T142692
- 19 爱护鸟类_第一课时(二等奖)(桂美版二年级下册)_T3763925
- 人教版二年级下册数学
- 沪教版八年级下册数学练习册21.4(1)无理方程P18
- 【部编】人教版语文七年级下册《过松源晨炊漆公店(其五)》优质课教学视频+PPT课件+教案,江苏省
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,天津市
- 外研版英语七年级下册module3 unit2第二课时
- 七年级英语下册 上海牛津版 Unit5
精品推荐
- 2016-2017学年高一语文人教版必修一+模块学业水平检测试题(含答案)
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
分类导航
- 互联网
- 电脑基础知识
- 计算机软件及应用
- 计算机硬件及网络
- 计算机应用/办公自动化
- .NET
- 数据结构与算法
- Java
- SEO
- C/C++资料
- linux/Unix相关
- 手机开发
- UML理论/建模
- 并行计算/云计算
- 嵌入式开发
- windows相关
- 软件工程
- 管理信息系统
- 开发文档
- 图形图像
- 网络与通信
- 网络信息安全
- 电子支付
- Labview
- matlab
- 网络资源
- Python
- Delphi/Perl
- 评测
- Flash/Flex
- CSS/Script
- 计算机原理
- PHP资料
- 数据挖掘与模式识别
- Web服务
- 数据库
- Visual Basic
- 电子商务
- 服务器
- 搜索引擎优化
- 存储
- 架构
- 行业软件
- 人工智能
- 计算机辅助设计
- 多媒体
- 软件测试
- 计算机硬件与维护
- 网站策划/UE
- 网页设计/UI
- 网吧管理