003 Risk Assessments
上传者:姜志平|上传时间:2015-04-28|密次下载
003 Risk Assessments
Procedure
Risk Assessments
ENGINEER’S STAMP:
CONTRACTOR’S STAMP: The Contractor declares that this submission has passed the contractor’s QA/QC procedure and is in accordance with the requirements of the Contract.
Signature
A REV
For Approval DESCRIPTION
BXP DRFT
ZHJ CHKD
201205 DATE
Customer: Cairo Electricity Production Company
Power Generation Engineering and Services Company
Contractor: General Electric Company And SEPCOIII Electric Power Construction Corporation Consortium
PROJECT No.: LOCATION: Banha SCALE: DOCUMENT No.: NA REV:A SUBCONTRACTOR: NA
TITLE: Risk Assessment
Sheet 1 of 20
内容需要下载文档才能查看
Procedure
Risk Assessment
内容需要下载文档才能查看
Procedure
Table of Contents
1. Introduction…………………………………………………………………………..…..… ..1 2. Definitions…………………………………………………….…………….………………...1 3. Guidance for implementation………………………………….………………….………..2 3.1. 3.2. 3.3. 3.4. 3.5. 3.6. 3.7. 3.8. 3.9.
Scope the risk assessment…………………………………………………………….…...2 Identify equipment, materials, activities/tasks and processes…………………………..3 Identify incidents …………..………………………………………………………………...3 Identify consequences ………….…………………………………………………………..3 Estimate likelihood of occurrence ………………………..………………………………..3 Estimate consequence severity ………………..………………………………………….3 Calculate risk …………….………………………………………………………… ……….4 Identify and implement risk control measures …………………………….……………..4 Compile risk control action plan ………………………….………………………………..5
3.10. Monitor and review risk assessments and control measures …………………………..5 3.10.1. Monitoring …….……………………………………………………………………………...5 3.10.2. Review …….………………………………………………………………………………….5 3.11. Communicate risk assessment results and risk control information…….……………..6 4. Analysis and Review ………….……………………………………………………………7 5. Training ……………………………………………………………….……………………...7 6. Records …….……………………………………………………………… ……………….7 Annexure 1 Risk Assessment Scope and Associated Equipment, Materials, Processes and
Activities ….………………………………………………….…….……………..1-1
Annexure 2 Risk Assessment Template ……………….………………………………… …..2-1 Annexure 3 Risk Matrix ………….……………………………………………………………...3-1 Annexure 4 Risk Control Action Plan …………………….…………………………………...4-1
Procedure
1. Introduction
Risk assessment is a technique for evaluating the likelihood that an incident will occur, and the probable consequences if it were to occur. Likelihood refers to the probability or chance that an incident will occur while consequence refers to the outcome of an incident in terms of injury, loss, damage or harm.
The aim of risk assessment is to establish the level of risk to enable the evaluation or judging of the acceptability of the level of risk. The objective of risk management is the reduction of the (level) of risk “as far as reasonably practicable” – to an acceptable level.
Hazards are things with the potential to cause injury, loss, damage or harm and are inherent to equipment, material, activities/tasks and processes. Equipment, material, activities/tasks and processes are therefore examined in detail through risk assessment, to identify –
Risk assessment provides a means for discovering and evaluating hazards to identify the hazards that must be controlled. Hazards can be controlled in two ways, namely:
Risk is a quantified combination of the abovementioned two factors. It is calculated by combining estimated values for the likelihood of an incident occurring and the severity of the consequence of an incident if it were to occur.
The formula for calculating risk is –
Risk (of a particular hazard) = Likelihood (of an incident occurring) x Severity (of a particular consequence).
Although the resulting risk value is a subjective estimation, it gives an indication of the risk level on which an evaluation or judgement of the acceptability of the risk can be based. Such a judgement is made during a structured risk assessment session by an informed group that includes persons actually exposed to the hazards.
how they could cause injury, loss, damage or harm (incident);
what the resulting injury, loss, damage or harm would be (consequence); how bad the injury, loss, damage or harm would be (severity); and
the probability/chance, with existing controls taken into account, that the injury, loss, damage or harm will occur (likelihood).
Limiting the chance (likelihood) of an incident occurring through preventive measures such as training, machine guarding, etc.; and
Limiting/controlling the consequences of an incident if it does occur, using fire extinguishers, first aid treatment, etc.
Procedure
The risk value also allows for the prioritisation of unacceptably high risks so that attention can immediately be focussed on critical/unacceptable risks, so that immediate and imminent danger can be treated first to prevent critical incidents from occurring.
The next level of risk is treated once the critical risks have all been dealt with. This phased approach ensures that risks are treated and eliminated methodically, according to their criticality.
2. Definitions
Consequence The outcome(s) of an incident in terms of injury, loss, damage or harm
caused
Hazard
An energy source, situation, substance or act with a potential for harm in terms of human injury, ill health or damage to equipment or the environment, or a combination of these
Incident
The occurrence of an event where the specified hazard causes injury, loss, damage or harm because of the release of or contact with the hazard
Likelihood Risk
The probability or chance that an incident will occur
A value expressing the combination of the likelihood of an incident occurring and the severity of the consequences of such an incident
Severity
An indicative value of the seriousness/severity/degree of harm of the consequence of an incident
Acceptable risk Hazard Identification Risk assessment
3. Guidance for Implementation
Risk assessments, through the identification of hazards and an analysis of the risk it presents, indicate where EHS management efforts have to be focussed and therefore play
Risk that has been reduced to a level that can be tolerated having regard to the OH&S Policy an legal obligations
Process of recognizing that a hazard exists and defining its characteristic. Process of evaluating risk(s) arising from a hazard(s) taking into account the adequacy of any existing controls, and deciding whether or not the risk(s) is acceptable.
下载文档
热门试卷
- 2016年四川省内江市中考化学试卷
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
- 山东省滨州市三校2017届第一学期阶段测试初三英语试题
- 四川省成都七中2017届高三一诊模拟考试文科综合试卷
- 2017届普通高等学校招生全国统一考试模拟试题(附答案)
- 重庆市永川中学高2017级上期12月月考语文试题
- 江西宜春三中2017届高三第一学期第二次月考文科综合试题
- 内蒙古赤峰二中2017届高三上学期第三次月考英语试题
- 2017年六年级(上)数学期末考试卷
- 2017人教版小学英语三年级上期末笔试题
- 江苏省常州西藏民族中学2016-2017学年九年级思想品德第一学期第二次阶段测试试卷
- 重庆市九龙坡区七校2016-2017学年上期八年级素质测查(二)语文学科试题卷
- 江苏省无锡市钱桥中学2016年12月八年级语文阶段性测试卷
- 江苏省无锡市钱桥中学2016-2017学年七年级英语12月阶段检测试卷
- 山东省邹城市第八中学2016-2017学年八年级12月物理第4章试题(无答案)
- 【人教版】河北省2015-2016学年度九年级上期末语文试题卷(附答案)
- 四川省简阳市阳安中学2016年12月高二月考英语试卷
- 四川省成都龙泉中学高三上学期2016年12月月考试题文科综合能力测试
- 安徽省滁州中学2016—2017学年度第一学期12月月考高三英语试卷
- 山东省武城县第二中学2016.12高一年级上学期第二次月考历史试题(必修一第四、五单元)
- 福建省四地六校联考2016-2017学年上学期第三次月考高三化学试卷
- 甘肃省武威第二十三中学2016—2017学年度八年级第一学期12月月考生物试卷
网友关注
- 交工资料目录
- 机房施工组织设计(适用于网上投标)
- 土建施工组织设计
- 山东建筑工程消耗量定额计算规则
- 聚达汽车零部件1、2 厂房施组
- 工程概况
- 东附属工程施工计划
- 加油站建设工程施工合同(凯里友谊加油一站)2
- 实施性施工组织设计2
- 小高层框架施工组织设计
- 江西永修至武宁高速公路某段施工图设计说明书
- 超经典养护施工组织设计
- 高大模板支撑系统专家评审专项施工方案
- 洛阳市第五十八中学教学楼工程施工组织设计
- 成钢施工组织设计
- 施工进度计划网络图
- 10标施工组织
- 房建的高层建筑施工组织设计
- 加气块砌筑施工方案07251
- 10MW施工组织设计方案
- 建筑工程有限责任公司安全生产管理体系全套资料
- 34层高层施工组织设计范本(共120页)
- 蓬安县业综合开发土地治理项目
- 省级安全文明示范工地创建资料
- 施工组织设计
- 北京六环路投标施工组织设计
- 铁路工程施工综合技术手册
- 湘南中学特长楼施工组织设计
- 最终环境整治施工组织设计
- 消防工程施工组织设计
网友关注视频
- 沪教版八年级下册数学练习册21.4(1)无理方程P18
- 外研版八年级英语下学期 Module3
- 冀教版小学数学二年级下册第二单元《有余数除法的竖式计算》
- 沪教版牛津小学英语(深圳用) 五年级下册 Unit 7
- 沪教版八年级下册数学练习册20.4(2)一次函数的应用2P8
- 沪教版八年级下册数学练习册一次函数复习题B组(P11)
- 精品·同步课程 历史 八年级 上册 第15集 近代科学技术与思想文化
- 二年级下册数学第一课
- 六年级英语下册上海牛津版教材讲解 U1单词
- 外研版英语三起5年级下册(14版)Module3 Unit1
- 化学九年级下册全册同步 人教版 第22集 酸和碱的中和反应(一)
- 冀教版小学英语四年级下册Lesson2授课视频
- 第19课 我喜欢的鸟_第一课时(二等奖)(人美杨永善版二年级下册)_T644386
- 沪教版牛津小学英语(深圳用) 五年级下册 Unit 10
- 人教版历史八年级下册第一课《中华人民共和国成立》
- 外研版英语七年级下册module3 unit2第一课时
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,广东省
- 北师大版八年级物理下册 第六章 常见的光学仪器(二)探究凸透镜成像的规律
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 2
- 外研版英语七年级下册module1unit3名词性物主代词讲解
- 沪教版八年级下次数学练习册21.4(2)无理方程P19
- 小学英语单词
- 【部编】人教版语文七年级下册《老山界》优质课教学视频+PPT课件+教案,安徽省
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 外研版英语三起6年级下册(14版)Module3 Unit1
- 第五单元 民族艺术的瑰宝_15. 多姿多彩的民族服饰_第二课时(市一等奖)(岭南版六年级上册)_T129830
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 12
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,辽宁省
- 化学九年级下册全册同步 人教版 第25集 生活中常见的盐(二)
- 【部编】人教版语文七年级下册《过松源晨炊漆公店(其五)》优质课教学视频+PPT课件+教案,辽宁省
精品推荐
- 2016-2017学年高一语文人教版必修一+模块学业水平检测试题(含答案)
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
分类导航
- 互联网
- 电脑基础知识
- 计算机软件及应用
- 计算机硬件及网络
- 计算机应用/办公自动化
- .NET
- 数据结构与算法
- Java
- SEO
- C/C++资料
- linux/Unix相关
- 手机开发
- UML理论/建模
- 并行计算/云计算
- 嵌入式开发
- windows相关
- 软件工程
- 管理信息系统
- 开发文档
- 图形图像
- 网络与通信
- 网络信息安全
- 电子支付
- Labview
- matlab
- 网络资源
- Python
- Delphi/Perl
- 评测
- Flash/Flex
- CSS/Script
- 计算机原理
- PHP资料
- 数据挖掘与模式识别
- Web服务
- 数据库
- Visual Basic
- 电子商务
- 服务器
- 搜索引擎优化
- 存储
- 架构
- 行业软件
- 人工智能
- 计算机辅助设计
- 多媒体
- 软件测试
- 计算机硬件与维护
- 网站策划/UE
- 网页设计/UI
- 网吧管理