Water and Waste Water Solutions
上传者:郭莹晖|上传时间:2015-04-15|密次下载
Water and Waste Water Solutions
sdcsd
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看WATER & WASTEWATER SOLUTIONS
sdcsd
No More Downtime. As the world’s most trusted provider of integrated piping maintenance, modification and repair capabilities for a full range of applications, TDW delivers customized water and wastewater solutions specifically designed to optimize performance, reduce costs and make downtime a thing of the past.
内容需要下载文档才能查看
sdcsd
内容需要下载文档才能查看
sdcsd
内容需要下载文档才能查看TDW Live Pipe
内容需要下载文档才能查看Modification Technology
Line Repairs and Modifications without
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看Service Interruptions
Only TDW offers a full range of live pipe modification
capabilities that allow vital water and waste water
services to remain uninterrupted during all types of
pipe system alterations while systems are under
flowing and pressurized conditions. As the innovator
and creator of STOPPLE® plugging technology and the industry leader in hot/wet tapping systems, TDW has
been installing or replacing line segments and valves
on large concrete, steel, ductile and cast iron piping
systems and providing field services associated with
these disciplines since the 1950’s.
Maintaining a continuous water supply and uninterrupted waste water disposal capabilities is a crucial concern for municipal and private entities the world over. The loss of clean potable water for any length of time adversely impacts fire protection services, hospitals, schools,
nursing homes and commercial/industrial facilities.
Shutting down and draining water systems for repair
only adds to time delays and expense due to bacterial infiltration and subsequent special procedures to
recertify a clean water supply.
Likewise, waste water systems are subject to severe
environmental limitations regarding the disposal of
liquids and solids that may result from the need to
repair or alter a pipe system. Making pipe system
modifications under full operational, flowing and
pressurized conditions eliminates downtime and
the associated problems resulting from repairs made during system shutdowns.
Live pipe modification technology from TDW assures
continued line flow during the following activities:
Line repair
Valve replacement
Branch connections
Line relocationsAction Sequence for a Tapping and Plugging Job Using a Temporary Bypass to Maintain Flow:1. Two STOPPLE® fittings are installed on the pipe.2. SANDWICH® valves are installed on STOPPLE® fittings.
3. Tapping machine makes taps through both STOPPLE®
fittings.
4. STOPPLE® plugging machines are installed with the option
of a temporary bypass.
5. Plugging heads are lowered into sealing position, diverting
flow through with the option of a temporary bypass.
6. With the flow stopped or diverted via the optional bypass,
workers cut and remove the isolated section.
7. Once the new section is tied in, the plugging heads are
retracted, returning full flow to the main.
8. The plugging machines and optional bypass lines are
removed.
9. Completion plugs are set in the STOPPLE® fittings and the
SANDWICH® valves are removed.
sdcsd
内容需要下载文档才能查看Tapping and Plugging Services
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看Case Studies
Location: Las Vegas, Nevada
Problem: The need to expand the capacity of the
Las Vegas area potable water delivery system.
Solution: TDW performed two record-breaking,
102-inch taps in the 120-inch I.D./142-inch O.D.,
steel reinforced concrete pipe with 11-inch
wall thickness using a TDW Model 2400 Tapping
Machine.
Result: The addition of one new 180-inch line
to the existing 120-inch water main running from
Lake Mead.Location: Baltimore, Maryland Problem: The need to tie in their 96-inch Southwest Diversion wastewater main into a new Grit Removal Facility at the Patapsco Wastewater Treatment Plant. The plant receives an average flow of 70 MGD and shutting down the main while making the new con-nection was simply not feasible. Solution: After successfully completing 60-inch taps, TDW Services installed two 60-inch by 96-inch folding head STOPPLE® Plugging Machines. The folded plugging heads were lowered through the
60-inch openings where the plugging heads opened
and created positive seals against the walls of
the pipe.
Result: A 200-foot section of the 96-inch
wastewater line was isolated allowing a
temporary 60-inch bypass to be installed to
maintain flow while the main was being tied
into the new Grit Removal Facility.
Location: New York City
Problem: The Manhattan Pumping Station owned
and operated by New York City’s Department of
Environmental Protection pumps sewage volumes
ranging from 170 MGD to 400 MGD. Faulty 60-inch
suction gate valves were preventing maintenance
service to main sewage pumps 1 and 2, which
meant the possibility of a 96-hour shut down and
the dumping of raw wastewater into the Hudson and
Lower East rivers while lines were bypassed so that
valves could be replaced.
Solution: TDW Services performed hot tapping and
plugging that successfully isolated a 10-foot section
of 42-inch pipe and allowed valve replacements to
take place.
Result: Valve replacement took place without
wastewater discharge into environmentally sensitive
areas. Because the TDW plugging process allowed
the pumping station to continue processing waste-
water, there was additional time to replace what was
discovered to be an excessively worn section
of pipe.
下载文档
热门试卷
- 2016年四川省内江市中考化学试卷
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
- 山东省滨州市三校2017届第一学期阶段测试初三英语试题
- 四川省成都七中2017届高三一诊模拟考试文科综合试卷
- 2017届普通高等学校招生全国统一考试模拟试题(附答案)
- 重庆市永川中学高2017级上期12月月考语文试题
- 江西宜春三中2017届高三第一学期第二次月考文科综合试题
- 内蒙古赤峰二中2017届高三上学期第三次月考英语试题
- 2017年六年级(上)数学期末考试卷
- 2017人教版小学英语三年级上期末笔试题
- 江苏省常州西藏民族中学2016-2017学年九年级思想品德第一学期第二次阶段测试试卷
- 重庆市九龙坡区七校2016-2017学年上期八年级素质测查(二)语文学科试题卷
- 江苏省无锡市钱桥中学2016年12月八年级语文阶段性测试卷
- 江苏省无锡市钱桥中学2016-2017学年七年级英语12月阶段检测试卷
- 山东省邹城市第八中学2016-2017学年八年级12月物理第4章试题(无答案)
- 【人教版】河北省2015-2016学年度九年级上期末语文试题卷(附答案)
- 四川省简阳市阳安中学2016年12月高二月考英语试卷
- 四川省成都龙泉中学高三上学期2016年12月月考试题文科综合能力测试
- 安徽省滁州中学2016—2017学年度第一学期12月月考高三英语试卷
- 山东省武城县第二中学2016.12高一年级上学期第二次月考历史试题(必修一第四、五单元)
- 福建省四地六校联考2016-2017学年上学期第三次月考高三化学试卷
- 甘肃省武威第二十三中学2016—2017学年度八年级第一学期12月月考生物试卷
网友关注
- 沙箱技术全解
- 跟踪外推效果和效率如何做效果更好.txt
- 什么是运营?运营到底是做什么的?
- 送她有创意的礼物
- 六大QQ营销的技巧
- 1-s2.0-S0022460X15002151-main
- 重要 单独申办二胎所需材料
- 白菜花
- 数字计算机仿真中消除代数环问题的研究_邱杰
- 汽车团购知多少
- 上海地铁1号线车辆辅助系统的国产化研制
- 互联网金融的基本模式及法律思考(下)
- A Simple Algorithm for Vapor
- XP XP 局域网互访
- 150KVA变频电源价格
- 模糊控制器在感应电动机伺服系统中的应用
- 核科学技术对人类社会发展的影响
- 企业网站如何制作
- 美国核管会2014版RG1.60 (NRC-RG1.60-2014版)
- 200KVA变频电源价格
- 浅谈网站如何利用百度文库引流
- 西安卫生间装修流程与技巧
- StorNext 面向大数据环境经实践验证的文件共享和归档解决方案 (Chinese) [DS00328S]
- Flash动画短片设计与制作论文目录
- 常用电脑易患腱鞘炎
- 17捡乐网的窗帘怎么买最划算
- 基于AT89C51单片机的彩色超声诊断仪延时散热系统的研制
- SAP_S4HANA_infographic_FINAL_zhCN
- 北京矿棉板吊顶价格
- 夏季漂流装备准备
网友关注视频
- 沪教版牛津小学英语(深圳用) 六年级下册 Unit 7
- 3.2 数学二年级下册第二单元 表内除法(一)整理和复习 李菲菲
- 冀教版小学英语五年级下册lesson2教学视频(2)
- 外研版英语七年级下册module1unit3名词性物主代词讲解
- 沪教版八年级下次数学练习册21.4(2)无理方程P19
- 冀教版小学数学二年级下册1
- 飞翔英语—冀教版(三起)英语三年级下册Lesson 2 Cats and Dogs
- 化学九年级下册全册同步 人教版 第22集 酸和碱的中和反应(一)
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 【部编】人教版语文七年级下册《过松源晨炊漆公店(其五)》优质课教学视频+PPT课件+教案,江苏省
- 第五单元 民族艺术的瑰宝_15. 多姿多彩的民族服饰_第二课时(市一等奖)(岭南版六年级上册)_T129830
- 沪教版八年级下册数学练习册20.4(2)一次函数的应用2P8
- 七年级英语下册 上海牛津版 Unit5
- 冀教版英语三年级下册第二课
- 第12章 圆锥曲线_12.7 抛物线的标准方程_第一课时(特等奖)(沪教版高二下册)_T274713
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 7
- 小学英语单词
- 冀教版小学数学二年级下册第二单元《租船问题》
- 【部编】人教版语文七年级下册《老山界》优质课教学视频+PPT课件+教案,安徽省
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 化学九年级下册全册同步 人教版 第25集 生活中常见的盐(二)
- 《小学数学二年级下册》第二单元测试题讲解
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,湖北省
- 冀教版英语五年级下册第二课课程解读
- 七年级英语下册 上海牛津版 Unit3
- 二年级下册数学第三课 搭一搭⚖⚖
- 冀教版小学数学二年级下册第二单元《有余数除法的整理与复习》
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 4
- 19 爱护鸟类_第一课时(二等奖)(桂美版二年级下册)_T502436
- 沪教版牛津小学英语(深圳用) 五年级下册 Unit 7
精品推荐
- 2016-2017学年高一语文人教版必修一+模块学业水平检测试题(含答案)
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
分类导航
- 互联网
- 电脑基础知识
- 计算机软件及应用
- 计算机硬件及网络
- 计算机应用/办公自动化
- .NET
- 数据结构与算法
- Java
- SEO
- C/C++资料
- linux/Unix相关
- 手机开发
- UML理论/建模
- 并行计算/云计算
- 嵌入式开发
- windows相关
- 软件工程
- 管理信息系统
- 开发文档
- 图形图像
- 网络与通信
- 网络信息安全
- 电子支付
- Labview
- matlab
- 网络资源
- Python
- Delphi/Perl
- 评测
- Flash/Flex
- CSS/Script
- 计算机原理
- PHP资料
- 数据挖掘与模式识别
- Web服务
- 数据库
- Visual Basic
- 电子商务
- 服务器
- 搜索引擎优化
- 存储
- 架构
- 行业软件
- 人工智能
- 计算机辅助设计
- 多媒体
- 软件测试
- 计算机硬件与维护
- 网站策划/UE
- 网页设计/UI
- 网吧管理