Evaluation of Signalized Intersection Service Level in the Traffic Impact
Assessment
Qian Wang1, a, Chunfu Shao1, b
1 MOE Key Laboratory for Urban Transportation Complex Systems Theory and Technology, Beijing
Jiaotong University, Beijing
a11120999@http://wendang.chazidian.com, cfshao@http://wendang.chazidian.com b
Keywords: traffic impact evaluation; signalized intersection; service level.
Abstract. Traffic Impact Assessment focuses on analysis and evaluation of the traffic flow generated by the proposed project impact on the road network in the future, through comparing the sections,intersection and other transportation infrastructure indexes such as traffic flow and road vehicle capacity, evaluate whether the traffic system can meet the increased traffic demand. In this paper, make the delay time and the road saturation as the evaluation index, studies the influence scope of the key signal intersection service level, in order to assess the impact of new projects on the signalized intersection. Cited Haikou province Hongzhou center as an example, based on the investigation of the traffic flow, calculate the time delay and road saturation to analyze the service level.
Introduction
Traffic impact assessment is to study the new projects or urban land use change impact on traffic. Its purpose is to analyze the scope and extent of the impact of the additional traffic demand affecting on the surrounding traffic environment , after the project is completed and put into use. It put forward countermeasures in a certain level of service to meet under the conditions to reduce the negative impact of the project to ease the pressure of traffic flow on the surrounding road traffic generated by the project. On this basis, this study put forward certain control measures and figured out a reasonable organization solution against related road. Among them, construction of traffic impact assessment of intersection within the project region is a most important item. It is worthy to research and explore continuously that how to analyze the change of the intersection before and after project completed in a quantitatively and intuitively way using the model and data and objectively and effectively put forward corresponding improvement proposal. Mostly urban intersection are signal control intersection. This paper analyzes the capacity, delay time and saturation of main signalized intersection to judge the level of service and the degree of influence on new projects.
Signalized intersection delay and saturation calculations
Signalized intersection delay calculation
Signalized intersection delay is an important indicator to evaluate the level of transport services and operational efficiency of Signalized intersection, which reflects not only the user pay the amount of time cost when through the signalized intersection, but also reflects the signalized intersection operating condition in the city road system . Signalized intersection operating in good condition, then the delay is low; otherwise high.
Signalized intersection saturation calculation
Signalized intersection saturation refers to the ratio of maximum amount of service traffic volume and traffic capacity, which is commonly referred to as V / C ratio, and also the main index to evaluate the intersection service level. If saturation exceeds 1.0, then the lane group oversaturated, and the intersection channelization design or timing design is not suitable for the current situation and planning requirements; if saturation is less than 1.0, it may also occur locally over time and space saturation.
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看
Signalized Intersection Evaluation of Traffic Impact assessment
Based on the《Technical Standards of Traffic Impact analysis of Construction Projects(CJJ/T141—2010) 》,determination of signalized intersection service level of motor vehicle,should meets the requirements listed in Tab. 2-1.
Case
Project description
Hongzhou Center Area is located in Haikou City, the heart of Jinmao area, is a set of office, hotel, apartments, residential and commercial as one of the mixed type of public construction projects, with a total area of 28664.70 square meters, with a total area of 25477.28 square meters of construction. Hongzhou center construction project started in 2013, and is expected to be completed in 2015. According to《Technical Standards of Traffic Impact analysis of Construction Projects》(CJJ/T141—2010) requirements for the location of the project ,determine the focus impact range of the project: west to the Mingzhu Road, south to the Jinlong Road and Longhua Road, east to the Longkun north Road, north to the Binhai road. The range is shown in Figure 3-1.
Figure 3-1 Schematic diagram of Hongzhou Center project study area
Intersection situation of the project surrounding
Hongzhou center project has a total of 8 intersections, which is shown in Tab. 3-1.
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看
Traffic volume analysis of the main signalized intersections around the project
Select a heavy traffic work day, using manual collection method take traffic investigation of intersections around the project area at morning rush hour (7:00 to 9:00) and evening peak (17:00 - 19:00). Select three signalized intersections near the project to analyze , the specific location shown in Figure 3-2, specifically: A intersection (Binhai Road - Yusha Road), B intersection (Jinmao Road - Yusha Road), C intersection (Longhua Road - longkun North road). The three intersections traffic volume shown in Tab. 3-2.
Figure 3-2 Intersections near the project
Key signalized intersections traffic demand forecast
The project period of traffic impact evaluation for normal use of first year and the normal use of fifth years. This paper argues that in 2013 the road network in the assessed area and present road network basically the same, therefore, 2018 for the project of traffic demand forecast target. The diagram of 3 intersections target year traffic volume of Fig. 3-3, Fig. 3-4 and Fig. 3-5, concrete results as shown in Tab. 3-3.
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看
Fig. 3-3 2018 traffic volume of A
intersection
Fig. 3-4 2018 traffic volume of B
intersection
Fig. 3-5 2018 traffic volume of C
intersection
Service level evaluation of key signalized intersections
Respectively evaluate the service level of three signalized intersections. (1) A intersection(Binhai Road - Yusha Road)
Turning traffic volume of A intersection before and after the implementation of the project in 2018 is shown in Tab. 3-4 and Fig. 3-6 and Fig.3-7. In 2018, after the implementation of the project, the East entrance and south entrance flow increased significantly, the East entrance flow increases from 4530 to 5083, the East entrance of straight flow and of the left flow differ considerably from these figures, respectively 431 and 122 vehicles; South entrance flow increases from 1791 to 2089, the South entrance of right turning increase is larger, 253 vehicles.
内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看 内容需要下载文档才能查看
Fig. 3-6 Traffic volume of A intersection
before implementationof the project in 2018 Fig. 3-7 Traffic volume of A intersection after implementation of
project in 2018
By comparing the target year service level of A intersection before and after the implementation of project (as shown in table 3-5, using Synchro software to calculate,) the level of service in 2018 is for F, indicating that the project has no effect on the A intersection.
Turning traffic volume of B intersection before and after the implementation of the project in 2018 is shown in Tab. 3-6 and Fig. 3-8 and Fig.3-9. In 2018, after the implementation of the project, the WEST entrance traffic flow increased significantly, from 2763 to 3042, the west entrance traffic flow of left increase largely, 247 vehicles.
Fig. 3-8 Traffic volume of B intersection Fig. 3-9 Traffic volume of B intersection before implementationof the project in after implementation of the project in 2018 2018
下载文档
热门试卷
- 2016年四川省内江市中考化学试卷
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
- 山东省滨州市三校2017届第一学期阶段测试初三英语试题
- 四川省成都七中2017届高三一诊模拟考试文科综合试卷
- 2017届普通高等学校招生全国统一考试模拟试题(附答案)
- 重庆市永川中学高2017级上期12月月考语文试题
- 江西宜春三中2017届高三第一学期第二次月考文科综合试题
- 内蒙古赤峰二中2017届高三上学期第三次月考英语试题
- 2017年六年级(上)数学期末考试卷
- 2017人教版小学英语三年级上期末笔试题
- 江苏省常州西藏民族中学2016-2017学年九年级思想品德第一学期第二次阶段测试试卷
- 重庆市九龙坡区七校2016-2017学年上期八年级素质测查(二)语文学科试题卷
- 江苏省无锡市钱桥中学2016年12月八年级语文阶段性测试卷
- 江苏省无锡市钱桥中学2016-2017学年七年级英语12月阶段检测试卷
- 山东省邹城市第八中学2016-2017学年八年级12月物理第4章试题(无答案)
- 【人教版】河北省2015-2016学年度九年级上期末语文试题卷(附答案)
- 四川省简阳市阳安中学2016年12月高二月考英语试卷
- 四川省成都龙泉中学高三上学期2016年12月月考试题文科综合能力测试
- 安徽省滁州中学2016—2017学年度第一学期12月月考高三英语试卷
- 山东省武城县第二中学2016.12高一年级上学期第二次月考历史试题(必修一第四、五单元)
- 福建省四地六校联考2016-2017学年上学期第三次月考高三化学试卷
- 甘肃省武威第二十三中学2016—2017学年度八年级第一学期12月月考生物试卷
网友关注
- 投标承诺函
- 团结就是力量
- 综合工时制排班表参考
- 统计自主学习报告
- 民族学专业毕业自我鉴定范文
- 关于遴选首届中共云南师范大学委员会学生特别委员、云南师范大学学生校长助理、学术委员会学生特邀委员公告
- 关于我国创新体制建设的思考
- 河南省中小学“优课”视频制作技术标准
- 村医卫监做啥--省卫监督工作指导手册 (1)
- 墨浓情深文字工作室
- 学校安保人员工作职责
- 西方经济学专业毕业自我鉴定范文
- 0毕业论文
- 产业园区写字楼租赁合同
- 2014年中小学国培计划通知
- 关于举办首届喷管中心PPT幻灯片制作大赛的通知
- 朝阳街道创国家卫生城市迎检复审工作方案
- 汽车装配厂气动机械手的PLC控制
- 物理实验室仪器管理制度
- 文艺学专业毕业自我鉴定范文
- 班级管理制度
- 甘当群众路线践行者,争做人民满意教育人2014.4.15
- 2015年5月全国大学英语四、六级口语考试报名通知
- 简单的制作店铺招牌
- 幼儿园安全应急预案
- 演练预案
- 某小区物业管理公司招标文件
- 教师集中示范培训方案
- 为保障食品安全致学生家长的一封公开信
- 12保温箱操作规程
网友关注视频
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 7
- 第12章 圆锥曲线_12.7 抛物线的标准方程_第一课时(特等奖)(沪教版高二下册)_T274713
- 北师大版数学 四年级下册 第三单元 第二节 小数点搬家
- 19 爱护鸟类_第一课时(二等奖)(桂美版二年级下册)_T3763925
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 《空中课堂》二年级下册 数学第一单元第1课时
- 3.2 数学二年级下册第二单元 表内除法(一)整理和复习 李菲菲
- 外研版英语七年级下册module3 unit2第一课时
- 冀教版小学数学二年级下册第二单元《租船问题》
- 冀教版小学数学二年级下册第二单元《有余数除法的竖式计算》
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 3
- 二年级下册数学第三课 搭一搭⚖⚖
- 七年级英语下册 上海牛津版 Unit5
- 苏科版数学八年级下册9.2《中心对称和中心对称图形》
- 北师大版八年级物理下册 第六章 常见的光学仪器(二)探究凸透镜成像的规律
- 北师大版数学四年级下册第三单元第四节街心广场
- 【部编】人教版语文七年级下册《过松源晨炊漆公店(其五)》优质课教学视频+PPT课件+教案,辽宁省
- 【部编】人教版语文七年级下册《泊秦淮》优质课教学视频+PPT课件+教案,湖北省
- 沪教版牛津小学英语(深圳用) 六年级下册 Unit 7
- 第五单元 民族艺术的瑰宝_16. 形形色色的民族乐器_第一课时(岭南版六年级上册)_T1406126
- 沪教版八年级下册数学练习册一次函数复习题B组(P11)
- 二年级下册数学第一课
- 沪教版八年级下册数学练习册21.3(3)分式方程P17
- 化学九年级下册全册同步 人教版 第22集 酸和碱的中和反应(一)
- 冀教版小学数学二年级下册第二单元《余数和除数的关系》
- 【部编】人教版语文七年级下册《老山界》优质课教学视频+PPT课件+教案,安徽省
- 精品·同步课程 历史 八年级 上册 第15集 近代科学技术与思想文化
- 化学九年级下册全册同步 人教版 第25集 生活中常见的盐(二)
- 沪教版八年级下册数学练习册21.3(2)分式方程P15
- 【部编】人教版语文七年级下册《过松源晨炊漆公店(其五)》优质课教学视频+PPT课件+教案,江苏省
精品推荐
- 2016-2017学年高一语文人教版必修一+模块学业水平检测试题(含答案)
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
分类导航
- 互联网
- 电脑基础知识
- 计算机软件及应用
- 计算机硬件及网络
- 计算机应用/办公自动化
- .NET
- 数据结构与算法
- Java
- SEO
- C/C++资料
- linux/Unix相关
- 手机开发
- UML理论/建模
- 并行计算/云计算
- 嵌入式开发
- windows相关
- 软件工程
- 管理信息系统
- 开发文档
- 图形图像
- 网络与通信
- 网络信息安全
- 电子支付
- Labview
- matlab
- 网络资源
- Python
- Delphi/Perl
- 评测
- Flash/Flex
- CSS/Script
- 计算机原理
- PHP资料
- 数据挖掘与模式识别
- Web服务
- 数据库
- Visual Basic
- 电子商务
- 服务器
- 搜索引擎优化
- 存储
- 架构
- 行业软件
- 人工智能
- 计算机辅助设计
- 多媒体
- 软件测试
- 计算机硬件与维护
- 网站策划/UE
- 网页设计/UI
- 网吧管理