FIDIC合同一般规定General-Provisions-of-FIDIC毕业论文外文文献翻译及原文
上传者:黄政|上传时间:2017-06-03|密次下载
FIDIC合同一般规定General-Provisions-of-FIDIC毕业论文外文文献翻译及原文
毕 业 设 计(论文) 外 文 文 献 翻 译
文献、资料中文题目: FIDIC合同一般规定 文献、资料英文题目:General Provisions of FIDIC 文献、资料来源:
文献、资料发表(出版)日期: 院 (部):
专 业:
班 级:
姓 名:
学 号:
指导教师:
翻译日期: 2017.02.14
3. “Employer’s requirements” means the document entitled employer’s requirements, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works.
4. “Tender” means the Contractor’s signed offer for the Works and all other documents which the Contractor submitted therewith (other than these
Conditions and Employer’s Requirements, if so submitted), as included in the Contract.
5. “Performance Guarantees” and “Schedule of payments” mean the documents so named (if any), as included in the Contract.
Parties and Persons
1. “Party” means the Employer or the Contractor, as the context requires.
2. “Employer” means the person named as employer in the Contract Agreement and the legal successors in title to this person.
3. “Contractor” means the person(s) named as contractor in the Contract Agreement and the legal successors in title to this person(s).
4. “Employer’s Representative” means the person named by the Employer in the Contract or appointed from time to time by the Employer under Sub-Clause 3.1 [ the Employer’s Representative], who acts on behalf of the Employer.
5. “Contractor’s Representative” means the person named by the Contractor in the Contract or appointed from time to time by the Contractor Sub-Clause
4.3 [the Contractor’s Representative], who acts on behalf of the Contractor.
6. “Employer’s Personnel” means the Employer’s Representative, the assistants referred to in Sub-Clause 3.2 [Other Employer’s Personnel] and all other staff, lab our and other employees of the Employer and of the Employer’s Representative; and any other personnel notified to the Contractor, by the Employer or the Employer’s Representative, as Employer’s Personnel.
7. “Contractor’s Personnel” means the Contractor’s Representative and all personnel whom the Contractor utilizes on Site, who may include the staff, lab our and other employees of the Contractor and of each Subcontractor, and any other personnel assisting the Contractor in the execution of the works. 8 “Subcontractor” means any person named in the Contract as a subcontractor, or any person appointed as a subcontractor, for a part of the Works; and the legal successors in title to each of these persons.
9. “DAB” means the person or three persons so named in the Contract, or other person(s) appointed under Sub-Clause 20.2 [Appointment of the
the period shall be one year.
8. “Performance Certificate” means the certificate issued under Sub-Clause 11.9 [Performance Certificate].
9. “Day” means a calendar day and “year” means 365 days.
Money and Payments
1.“Contract Price” means the agreed amount stated in the Contract Agreement for the design, execution and completion of the Works and the remedying of any defects, and includes adjustment (if any) in accordance with the contract.
2. “Cost” means all expenditure reasonably incurred (or to be incurred) by the Contractor, whether on or off the Site, including overhead and similar charges, but does not include profit.
3. “Final Statement” means the statement defined in Sub-Clause 14.11[Application for Final Payment].
4. “Foreign Currency” means a currency in which part (or all) of the Contract Price is payable, but not the Local Currency.
5. “Local Currency” means the currency of the Country.
6. “Provisional Sum” means a sum (if any) which is specified in the Contract as a provisional sum, for the execution of any part of the Works or for the supply of Plant, Material or services under Sub-Clause 13.5 [Provisional Sums].
7. “Retention Money” means the accumulated retention moneys which the Employer retains under Sub-Clause 14.3 [Application for Interim Payments] and pays under Sub-Clause 14.9 [Payment of Retention Money].
8. “Statement” means a statement submitted by the Contractor as part of an application for payment under Clause 14 [Contract Price and Payment]. Works and Goods
1. “Contractor’s Equipment” means all apparatus, machinery, vehicles and other things required for the execution and completion of the Works and remedying of any defects. However, Contractor’s Equipment excludes Temporary Works, Employer’s Equipment (if any), Plant, Materials and any other things intended to form or forming part of the Permanent Works.
下载文档
热门试卷
- 2016年四川省内江市中考化学试卷
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
- 山东省滨州市三校2017届第一学期阶段测试初三英语试题
- 四川省成都七中2017届高三一诊模拟考试文科综合试卷
- 2017届普通高等学校招生全国统一考试模拟试题(附答案)
- 重庆市永川中学高2017级上期12月月考语文试题
- 江西宜春三中2017届高三第一学期第二次月考文科综合试题
- 内蒙古赤峰二中2017届高三上学期第三次月考英语试题
- 2017年六年级(上)数学期末考试卷
- 2017人教版小学英语三年级上期末笔试题
- 江苏省常州西藏民族中学2016-2017学年九年级思想品德第一学期第二次阶段测试试卷
- 重庆市九龙坡区七校2016-2017学年上期八年级素质测查(二)语文学科试题卷
- 江苏省无锡市钱桥中学2016年12月八年级语文阶段性测试卷
- 江苏省无锡市钱桥中学2016-2017学年七年级英语12月阶段检测试卷
- 山东省邹城市第八中学2016-2017学年八年级12月物理第4章试题(无答案)
- 【人教版】河北省2015-2016学年度九年级上期末语文试题卷(附答案)
- 四川省简阳市阳安中学2016年12月高二月考英语试卷
- 四川省成都龙泉中学高三上学期2016年12月月考试题文科综合能力测试
- 安徽省滁州中学2016—2017学年度第一学期12月月考高三英语试卷
- 山东省武城县第二中学2016.12高一年级上学期第二次月考历史试题(必修一第四、五单元)
- 福建省四地六校联考2016-2017学年上学期第三次月考高三化学试卷
- 甘肃省武威第二十三中学2016—2017学年度八年级第一学期12月月考生物试卷
网友关注
- 亚洲劳动力人口结构
- 邢台七里河的传说
- 【百家】周国平:人生要有不较劲的智慧
- 我国房地产泡沫问题及实证分析
- 城乡二元制度对农民工市民化影响的实证分析
- 房地产泡沫问题及实证分析
- 如何道歉
- 墨尔本大学心理学
- 郑燮的《墨竹图》
- 姚治华和张宝志探讨书画艺术
- 传统中西生死观
- 昆士兰大学翻译
- 1 吉卜赛人是什么人_法国为什么要驱逐他们_ClaireSuddath
- 低碳环保生活
- 我国网民新媒介素养研究综述_李冬霞
- 中国传统饮食文化
- 书画收藏简述
- 欧洲文化作业97分
- 中美房地产业投入产出比较分析
- 如何避免夏季驾车烦躁
- 斯威本科技大学心理学与心理生理学学士
- 转型时期消费升级与产业发展的相关性_基于投入产出表的分析
- 赠送书画(图)
- 推进北京文化产业与科技融合的财政政策研究_江光华
- 《形态设计》智能产品市场调研
- 性格加智慧构成人的风格
- 优入圣域_王阳明_孔子教育方法之比较_王胜军
- 我的徐派情缘
- 应天齐:循序渐进的当代艺术探索
- 旅顺历史博物馆之旅
网友关注视频
- 冀教版小学数学二年级下册第二周第2课时《我们的测量》宝丰街小学庞志荣
- 沪教版八年级下册数学练习册21.4(1)无理方程P18
- 第五单元 民族艺术的瑰宝_16. 形形色色的民族乐器_第一课时(岭南版六年级上册)_T1406126
- 外研版英语七年级下册module1unit3名词性物主代词讲解
- 沪教版八年级下册数学练习册20.4(2)一次函数的应用2P8
- 19 爱护鸟类_第一课时(二等奖)(桂美版二年级下册)_T3763925
- 青岛版教材五年级下册第四单元(走进军营——方向与位置)用数对确定位置(一等奖)
- 沪教版牛津小学英语(深圳用) 六年级下册 Unit 7
- 3月2日小学二年级数学下册(数一数)
- 【部编】人教版语文七年级下册《逢入京使》优质课教学视频+PPT课件+教案,安徽省
- 二年级下册数学第三课 搭一搭⚖⚖
- 冀教版英语三年级下册第二课
- 沪教版牛津小学英语(深圳用)五年级下册 Unit 1
- 冀教版英语五年级下册第二课课程解读
- 北师大版小学数学四年级下册第15课小数乘小数一
- 二年级下册数学第二课
- 沪教版牛津小学英语(深圳用) 五年级下册 Unit 7
- 北师大版八年级物理下册 第六章 常见的光学仪器(二)探究凸透镜成像的规律
- 六年级英语下册上海牛津版教材讲解 U1单词
- 冀教版小学数学二年级下册第二单元《有余数除法的简单应用》
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 12
- 冀教版英语四年级下册第二课
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 2
- 外研版英语七年级下册module3 unit2第二课时
- 沪教版牛津小学英语(深圳用) 四年级下册 Unit 4
- 苏科版数学七年级下册7.2《探索平行线的性质》
- 二次函数求实际问题中的最值_第一课时(特等奖)(冀教版九年级下册)_T144339
- 沪教版八年级下次数学练习册21.4(2)无理方程P19
- 北师大版数学四年级下册3.4包装
- 每天日常投篮练习第一天森哥打卡上脚 Nike PG 2 如何调整运球跳投手感?
精品推荐
- 2016-2017学年高一语文人教版必修一+模块学业水平检测试题(含答案)
- 广西钦州市高新区2017届高三11月月考政治试卷
- 浙江省湖州市2016-2017学年高一上学期期中考试政治试卷
- 浙江省湖州市2016-2017学年高二上学期期中考试政治试卷
- 辽宁省铁岭市协作体2017届高三上学期第三次联考政治试卷
- 广西钦州市钦州港区2016-2017学年高二11月月考政治试卷
- 广西钦州市钦州港区2017届高三11月月考政治试卷
- 广西钦州市钦州港区2016-2017学年高一11月月考政治试卷
- 广西钦州市高新区2016-2017学年高二11月月考政治试卷
- 广西钦州市高新区2016-2017学年高一11月月考政治试卷
分类导航
- 互联网
- 电脑基础知识
- 计算机软件及应用
- 计算机硬件及网络
- 计算机应用/办公自动化
- .NET
- 数据结构与算法
- Java
- SEO
- C/C++资料
- linux/Unix相关
- 手机开发
- UML理论/建模
- 并行计算/云计算
- 嵌入式开发
- windows相关
- 软件工程
- 管理信息系统
- 开发文档
- 图形图像
- 网络与通信
- 网络信息安全
- 电子支付
- Labview
- matlab
- 网络资源
- Python
- Delphi/Perl
- 评测
- Flash/Flex
- CSS/Script
- 计算机原理
- PHP资料
- 数据挖掘与模式识别
- Web服务
- 数据库
- Visual Basic
- 电子商务
- 服务器
- 搜索引擎优化
- 存储
- 架构
- 行业软件
- 人工智能
- 计算机辅助设计
- 多媒体
- 软件测试
- 计算机硬件与维护
- 网站策划/UE
- 网页设计/UI
- 网吧管理